We did a full home remodel with a 500 sq. ft. master bathroom and bedroom addition. One bathroom and powder room were remodeled; the kitchen walls were removed to create an open floor plan, and the kitchen was remodeled. We replaced the furnace and all the duct work, updated all the electrical in the home, added a full interior and exterior paint job, and added new gutters. We removed the brick at the front of the home and replaced it with siding.